italiano english deutsch français español pусский язык
 

Home > Services > The final test

Test and Inspection

Complete test and inspection at DALLAN premises: guarantee for your results

At Dallan every machine is completely tested on DALLAN premises, prior to shipment, with the end customer present.

During the final test, together we check the quality of the finished product, the construction and the performance of the system; we also train your operators. Experience has shown us that this final test and inspection reduces installation times on the customer’s premises by more than 50% and in fact most of the systems we deliver are installed and running within one or two weeks from the arrival of our technicians.

Our technicians who work abroad can speak - in addition to Italian - English, French, German, Spanish, Russian and Brazilian and can therefore talk with your employees in the language they prefer: this also makes installation much easier and is for you a further guarantee of an optimum end result.

Placed at the end of the document so the pages load faster